2690 m3 Trailing Suction Hopper Dredger (TSHD)

  • 1,000,000 USD
  • 190302-DS

Launched in 2006 by Fujian Xiongying Shipyard. The dredger’s voyage area is Coastland & (A1 +A2). Loading time for the 2690 m3 hopper is 45 minutes. Discharge time is 15 minutes. Flowing for slop pump is 6500m3/h. Dredging depth underwater is 30 m (98.4-ft). The dredger has a length of 87.8 m (288-ft), a beam of 13.8 m (45.3-ft) and a loading draft of 6.5 m (21.3-ft). The main engine power is 2352 kW/ 600 r/min x 1.

SOLD

Location: China

General
Year Built/Location: 2006
Port of Registry: Fuzhou
Class Notation: CCS, Coastland & (A1 +A2).
Principal Dimensions and Characteristics
Length Over All: 87.8 m 288-ft
Beam: 13.8 m 45.3-ft
Draft (Ballast): 4.767 m 15.6-ft
Draft (Loading): 6.5 m 21.3-ft
GT/NT: 2465 / 1380 2717 / 1521
DWCC: 2770 3053
Dredging
Dredging Depth: 30 m 98.4-ft
Dredging Draft: 6.8 m 22.3-ft
Dredging Speed: 3 knots
Loading Time: 45 minutes
Dredging Pump Capacity: 6500 m3/h 8501 yd3/h
Discharge Time: 15 minutes
Machinery
Engine: 2352 kW/ 600 r/min x 1
All details on these pages are given in good faith and are believed to be accurate but no warranty of accuracy or completeness or suitability for purpose is either stated or implied. Prices are subject to change without notice.