This 4 Point Mooring 30 men Accommodation Working Barge was built in 2011 and its Classification Society is BV (Bureau Veritas). The next Dry Docking and Special Survey are due in October, 2016.
Flag: Panama
Located in the Middle East
“As Is, Where Is” Basis
Principal Dimensions and Characteristics | ||||
Year Built: | 2011 | |||
Classification Society: | BV (Bureau Veritas) | |||
Hull Material: | Flat Bottom Raked Stern and Bow | |||
Length Over All: | 45.00 m | 148 feet | ||
Beam: | 15.00 m | 49 feet | ||
Depth: | 3.40 m | 11 feet | ||
Draft: | 1.50 m | 5 feet | ||
GRT/NRT: | 554/166 | |||
Dead Weight: | 1,150 tons | |||
Accommodation: | ||||
Total Berths: | 25, 4 in 20 feet container with attached toilet & shower; | |||
21 in 40 feet container – 20 feet container wash room with | ||||
7 toilets and 5 showers – 20 feet container for galley and | ||||
dining room. Air conditioning | ||||
Machinery & Propulsion | ||||
Total Power Output (kW/hp): | Not Applicable (Not Propelled) | |||
Top Drive: | 1 x Dando 500, 3,600 lbs.ft,10 Tons | |||
Cargo, Tank Capacities & Range at Sea | ||||
Deck Cargo: | 2,000 tons | |||
Deck Area: | 500 m2 | |||
DecK Load: | 10 tons/m2 | |||
Mud Storage Capacity: | ||||
Active Liquid Mud: | 2 x 10 cubic meters | 2 x 13 cubic yards | ||
Guargum Sack: | 10 tonnes | |||
Deck & Towing, Lifting, Mooring Equipment | ||||
Four Point Mooring System: | ||||
4 x Mooring Lines | ||||
4 x 3T Delta Flipper Anchors | ||||
Wire Rope 38 mm (1.5 in.), 700 m (2,297 ft.) long | ||||
4 x Single Drum Wire Winches 40T max | ||||
Electrical Supply | ||||
2 x Cummins Gensets with 150 KVA, 50 Hz | ||||
1 x Cummins Gensets with 60 KVA, 50 Hz | ||||
Additional Information | ||||
Stem to place crawler crane up to 200 MT, approved by BV | ||||
30 men sewage treatment plant | ||||
Discharge scuppers directly offshore post being treated | ||||
Reverse Osmosis plant about 1 ton/day | ||||
(seawater to potable fresh water) | ||||
All details on these pages are given in good faith and are believed to be accurate but no warranty of accuracy or completeness or suitability for purpose is either stated or implied. Prices are subject to change without notice. |